The ICN report does not provide the minimum amount of data fields to provide our NECC system (RCRP) with enough data fields to calculate readiness as the system is currently structured.
Recommended:
NECC requests the ability to extract known data from the ICN report, which would require an expansion of the fields currently available. The ICN report as it exists today can dive into the contents of SKO kits indicating that that data is already in the DPAS system. NECC is requesting a report that would show kit component stock#, Stock serial#, SKO#, SKO serial # and SKO secondary serial #
Mission Critical:
N/A
Benefits:
Provides line item data for readiness reporting.
Frequency:
Monthly
Users:
Minimum users at ECH III command when running the ICN report.
Welcome to the NEW ELMS Support Site. You may still see some documents or other items still referencing DPAS, but we are working to update our remaining content as soon as possible. Be sure to update your bookmark to https://elmssupport.golearnportal.org.
Please note that the URL for the live Production environment has changed due to the ELMS name rebranding process. The new URL for ELMS Production is: https://prod.elms.dla.mil
Please be advised that due to server maintenance by DLA Info Operations, ELMS will be inaccessible for an estimated 10 minute timeframe, to occur at some point between the hours of 0200-0500 EDT on Monday, June 16th. Please plan accordingly.