System Change Requests Header
SCR Number: 00626
Title
WO Calendar Tracker

ELMS Module
MU

Reporting Org
OSD

State
Removed

History
CANCELED from the M&U Workshop, this capability was provided when DPAS provided the capability to email the customer within the WO (Release 3.1). Other suggested capability exists within the WO Journaling.

Description
Army contracts off-site maintenance and has to capture date of every evolution. The dates required are: Date to Maintenance, Date to Vendor, Date Vendor?Complete, Date From Vendor, Date Unit Notified and Date Unit Accepted. Recommend six calendar driven fields for required dates captured. WO open = Date to Maintenance and WO Close = Date Unit Accepted.??Do not make these mandatory. WO Open and Close should still be driven by WO but can be override by using calendar. Customer priority: 2


×