Description
EO 13693 requires an interface between Agency FMIS and GSA systems for Fleet information exchange.
Leased vehicle inventory data at GSA needs to be pulled at least monthly.
Recommended
GSA uses a Application Programming Interface (API) to pull inventory data (attached) and a File Transfer Protocol (FTP) to receive mileage information (attached).
Mission Critical
EO 13693 required to meet Vehicle Level Data Reporting to FAST
Benefits
Reduces time and improves accuracy of information.
Users
M&U additional working from closed Help Desk Ticket 9505 since this will have to be modified to complete SCR
Please assist with the following problems within DPAS:
1) To meet EO 13693 VLD Reporting for Vehicle Type, please align the DPAS Vehicle Type Code table to the following values:
Low-speed Vehicle
Sedan/St Wgn Subcompact
Sedan/St Wgn Compact
Sedan/St Wgn Midsize
Sedan/St Wgn Large
Sedan Limousine
LD SUV 4x2
LD SUV 4x4
LD Minivan 4x2 (Passenger)
LD Minivan 4x2 (Cargo)
LD Minivan 4x4 (Passenger)
LD Minivan 4x4 (Cargo)
LD Van 4x2 (Passenger)
LD Van 4x2 (Cargo)
LD Van 4x4 (Passenger)
LD Van 4x4 (Cargo)
LD Pickup 4x2
LD Pickup 4x4
LD Other 4x2
MD SUV
MD Van (Passenger)
MD Van (Cargo)
MD Pickup
MD Bus
MD Other
Ambulance
HD
HD Bus
Is there a way to reset the Vehicle Type Cd to 'Select an Item' for all the current Van categories so FM can correctly identify assets as LD Minivan, LD Van and MD Van?
2) For every DPAS Vehicle Type Code, there should be an Owned and Leased Vehicle Group Code added.
Please add those new Group Codes to:
104 - HD E/ER
107 - LD Van 4x4 (Cargo)
108 - LD Van 4x4 (Passenger)
126 - Sedan Limousine
Very respectfully, Deric J. Sims DoD NTV Fleet Mgr/DPAS SME OUSD (AT&L), ARA Property & Equipment Policy Suffolk Building 5611 Columbia Pike, Rm 05C15 Falls Church, VA 22041 NIPR Email: ?

Please be advised that Navy Property Accountability module users will be unable to access ELMS during the period beginning 3pm EST on Tuesday September 29th, until 8am EST on Friday October 2nd due to the annual EOFY lockout period. If you have questions, please direct them to the Navy PP&E Management Support Office via their centralized email inbox, which is
Please be advised that ELMS will be unavailable beginning Friday, October 2nd at 9:00 pm EST for server maintenance. Estimated downtime is stated to last up to 60 minutes in length - please plan accordingly.