Description
We have space suits that come due based on a calendar interval or a meter reading, which ever comes first.
Recommended
We need ability to set an override on an inspection due date with a meter reading, set at the NSN level.
Mission Critical
critical
Benefits
time savings. currently using manual entries to figure out inspection cycles.
Users
All AFERMS
Completed – Release 2020.3 – 9 October 2020