01300 |
Update Open Work Order Screen |
MU |
AF: VSCOS |
Removed |
Description Currently, the open work order dashboard displays all open work orders but does not provide enough information to quickly and accurately pull an Estimated Time In Completion (ETIC) report.
Recommended Add available fields: LIN/TAMCN, Maint Grp ID, Equip Pool, Approval Date, Team, Remarks as well as a download feature (PDF & Excel) from the main open work order dashboard. Also add filters on all column headers. This will allow managers to sort the ETIC sheet as desired and print the information as it is displayed on the screen. See attachment (below) which details basic requirement.
Mission Critical Critical. The current process does not give a Vehicle Fleet Manager the ability to look at the open work order screen and get an accurate depiction vehicle maintenance status of assets within the shop.
Benefits Benefits of this solution enable Vehicle Fleet Managers with the ability to check the status of their maintenance actions within a few clicks of the mouse.
Users All Air Force Fleet Managers/Maintenance controllers and Material specialists utilize this information for day to day fleet management purposes.
21Feb2025 – cancelled per Luther Meitzner |
|
|
01299 |
Improve Performance of Master Issue List to UIC association |
Warehouse |
Leidos |
Done |
Description The current design of the association of Master Issue List (MIL) to UIC requires 1 association record for every MIL-UIC combination, and does not allow the user to create a MIL that is available for every UIC in their Logistics Program regardless of the addition of future UICs.
Recommended Create a checkbox on the Master Issue List Add/Edit screen that indicates this MIL is for all UICs. Setup the screen such that if a user does select any UICs, it unchecks the box. Set the database and code up such that no association records are required for MILs that have been set up to be available for all UICs.
Mission Critical mission critical. As more and more Master Issue Lists are created and associated to more UICs, the performance of that association will continue to degrade without this feature.
Benefits Performance of the system.
Users All users.
Completed - Release 6.1.40
|
|
|
01298 |
Attachments for ICNs |
Warehouse |
Navy: NAVAIR |
Removed |
Description Our current system allows attachments at the asset level however DPAS Warehouse only allows attachments at the Stock Number or Transaction level. The Proposed Improvement will allow us to create attachments at the ICN level and then migrate them over from eTIMS to DPAS.
Recommended Allow Attachments at the ICN level through Inventory Update and During the Receiving Process for the following file types:
- jpeg,
- pjpeg,
- png,
- x-png,
- gif,
- pdf,
- MS Office (Word, Excel, Power Point)
Mission Critical Mission Critical. Our warehouse is a central issue, shipping, and storage facility with owners and managers who are off site. Attaching files to an asset is crucial to communication and selection of the correct assets from locations across the globe.
Benefits Allows us to successfully migrate from eTIMS to DPAS, Improves accuracy of data, shipments, and decisions for parties who are not in the same geographical location as the warehouse.
Users All users can benefit from being able to attach records, pictures, files to an ICN.
26Jun2018 – cancelled per Randy Reed This is the same as SCR 01126. |
|
|
01297 |
Add City State Location Table Update |
PA |
Navy |
Removed |
Description Navy is undergoing FIAR audit. Auditors are asking for the city and state be added to asset universe reports to better define the actual physical address location of an asset. Navy Major Commands and their subordinate UIC's are manually adding city and state to asset reports for reporting to the audit community which is a heavy lift burden. Navy has a need to have City and State added to the Location table in order for CPO's and APO's to better account for and report asset physical address location for audit purposes. Navy needs a system wide solution instead of using a combination of manual workarounds.
Recommended Recommend City and State Fields be added to the Location Table and make these fields mandatory entries when adding or updating locations. There maybe other solutions that are available that are not considered and Navy is willing to discuss those options. Also need City and State added as fields to the Inquiry/ Asset Management / Asset and Master Data/ Location modules for reporting purposes.
Mission Critical Mandated. This SCR is a result of the DOD FIAR Audit efforts. Auditors are requiring BSO's to add City and State field to the Asset Universe Reports to identify actual physical address of the asset.
Benefits Adding these fields will add visibility of the actual physical address location of an asset relative to inventory and financial accountability.
Users Would affect any users of the Property Accountability module DoD wide.
***
Per follow up communication from Boone with Navy PP&E/William Aldrich with Navy FMO, this is on hold/suspended temporarily pending further internal discussion between PP&E/FMO. They intend to follow up by end of next week stating whether they want to amend the existing submission, or retract the existing SCR and resubmit something completely different down the line.
***
21 Aug 2019 – cancelled per Kevin Callahan No Longer Required. |
|
|
01296 |
Upcoming Work Report |
MU |
Army |
New |
Description The upcoming work report does not reflect the dates that are entered in the scheduled preventive maintenance screen. The scheduled maintenance that has the "last maint date" as the setting is showing on the report, but the "set schedule date" is not showing on the report. In the past this report would show both dates and now it will only shows the one date. We would like this fixed so that we can properly report upcoming work orders to customers to properly project maintenance requirements. At this time we are using an additional spreadsheet to track information that DPAS should be reporting to us.
Recommended That when a upcoming work report request is submitted that the report once received actually accurately reflects what is in the scheduled preventive maintenance schedule. That if a date change is made or a new schedule for is made for any equipment (new or existing) that that upcoming work report will update these changes within twenty four hours. This used to work.
Mission Critical Critical accurate forecasting ensures customers know when they need to have equipment dropped off to be serviced (work order completed).
Benefits Keeps equipment maintenance up to date, reduces the possibility of equipment being out of compliance and possibly being deadlined, especially mission critical equipment such as forklifts, etc.
Users I believe it probably affects all M&U concerned individuals |
|
|
01295 |
Utilization Report Extract Improvement |
MU |
DLA |
New |
Description Problem: Tracking utilization is very important in Fleet Management. The new Utilization Report Extract tracks and reports utilization, but needs to be updated for all assets loaded into DPAS. Currently, the report defaults the Util Target Monthly to 1000 for FAST Reportable vehicles and all FAST Reportable Vehicles Util Target Monthly isn't 1000. Also, the report defaults the Util Target Monthly to 0 for all other assets reporting utilization.
Recommended When an Agency or Service is developing the DPAS catalog there are mandatory fields that are required to have data inputted; Yr SVC Life and Util SVC Life. Each and every asset placed in DPAS must have a SN created, regardless of agency. One agency may use 8yrs/200,000 and another 10yrs/250,000 (not saying either is right or wrong), but there must be values inputted. Everything is driven from these two fields. Using the two fields the calculation should be:
- Util SVC Life (250000)/Yr SVC Life (10)= Util Target Annual (25000)
- Util Target Annual (25000)/12 (months)=Util Target Monthly (2083)
The formula is agency neutral, it is the data in the fields that drive the end result. This should be the case regardless of type of asset. And that value should populate the Util Target Monthly in the MAM, as well as the report. These values are already being utilized to develop the Utilization Report Extract. Once the Util Target Monthly is calculated and populated request that it be greyed out for all users (this value will be calculated from the information gathered from the catalog), as well as the Minimum Objective Percent and Objective Percent.
Mission Critical This is mission critical because it supports tracking proper use of assets and tracking of under utilized assets correctly.
Benefits This will benefit all activities in DPAS by reducing time and error in reporting. Having DPAS perform the calculations allows the system to work for the user. It removes the human factor from having to perform calculations which can introduce errors.
Users This should affect ALL users utilizing DPAS. |
|
|
01294 |
QC Completion Date |
Warehouse |
AF: AFERMS |
Removed |
Description For AFE a QC is an inspection of an inspection. currently we can create a QC from an inspection, but from there the two inspections are in no way related in the system. If I complete an inspection at the end of the month and the QC is not completed until the beginning of the next month, it screws up the % reporting for two months. It shows a shortfall for the month the inspection was accomplished and an overage for month the QC was accomplished.
Recommended make the completion date of the QC default to the completion date of the inspection it was created from.
Mission Critical critical. our percentage reporting is worthless without it. Manual tracking systems have to be implemented until this is corrected.
Benefits many man/hours scouring QC results inquiry matching up inspection with QCs and manually calculating percentages.
Users All AFERMS |
|
|
01293 |
CBRN Gear Report Format |
Warehouse |
Leidos |
Done |
Description The CBRN gear formatting as currently designed is confusing to the users with the on-hand quantity being duplicated on all NSNs within a warehouse. It also takes to long to produce the report when it includes all the individual warehouse tabs.
Recommended
- Modify the format of the report to include the On-Hand Quantity = 0 for each Warehouse.
- Remove the additional Warehouse tabs on the report and only show the Summary page.
Mission Critical Yes. This report is used to track CBRN gear through the LP.
Benefits .
Users Yes.
Completed - Release 6.1.22 |
|
|
01292 |
Power User Tool |
Warehouse |
Leidos |
Done |
Description Users currently have no way to merge two EDI PIs if a member has two EDI PIs assigned to them. The users have to submit a ticket to the DPAS Help Desk and have a script run to merge the two EDI PIs for the Member.
Recommended Develop a "Power User Tool" screen that will allow select and limited number of users the ability to enter the users two EDI PIs and merge them from the UI. Will decrease the amount of time between completion and the number of Help Desk tickets.
Mission Critical Yes. Will decrease the amount of time between completion and the number of Help Desk tickets.
Benefits Reduces time between completion.
Users Power Users
Completed - Release 6.2.40 |
|
|
01291 |
Inventory Activity Columns |
Warehouse |
USMC: CSP |
Removed |
Description Currently there is no Physical Inventory Number or Issued DODAAC Columns in Inventory Activity.
Recommended For Audit purposes recommend that the Physical Inventory Number and Issued DODAAC columns be added to Grid Options Columns In Inventory Activity.
Mission Critical Yes this will help with audit purposes to be able to show the physical inventory number for all Loss or Gain transaction. Also to be able to view the issued DODAAC for warehouse issues and MRO's instead of having to go to multiple areas to get this information. Thus helping with reports that are required on a monthly basis.
Benefits Having this functionality will help from having to go through multiple steps to get the information we need for Audit Purposes.
Users All IIF/UIF
11 Mar 2021 – cancelled per Jack Sanders No Longer Needed. |
|