01089 |
Default Work Start End Dates |
Warehouse |
AF: AFERMS |
Removed |
Description During the Inspection and process, the Work Start and Work end dates should default to the day an individual opened it.
Recommended Default date to date started, but leave it changeable
Mission Critical Desired, save extra clicking and time
Benefits
Users all |
|
|
01088 |
ICN Scan On DW01 |
Warehouse |
AF: AFERMS |
Done |
Description there is a scan block for everything except the kit itself on a DW01
Recommended add the bar code for the kit at the top of the DW01
Mission Critical desirable
Benefits if the tag on the kit is damaged
Users all
Completed – Release 6.3 – 21 December 2018 |
|
|
01087 |
Kit Assembly Request |
Warehouse |
AF: AFERMS |
Removed |
Description Material management SKO kit assembly grid. I see everything I ever built. this is not organized and it is not easy to see what I need to build.
Recommended make a check box like serial update "show completed" . I should not see completed assebly requests unless I check that box.
Mission Critical desired.
Benefits organized data
Users all |
|
|
01086 |
Managing Service In Months |
Warehouse |
AF: AFERMS |
Done |
Description NSN Managing Service Life in Days. we don't use days for service life.
Recommended change days to months.
Mission Critical highly desired. I have to do the math every time I put something in here and it is only close, not the actual expiration.
Benefits accurate data
Users all
Completed – Release 6.2.2 – 21 Spetember 2018 |
|
|
01085 |
Multiwarehouse Individual Issue |
Warehouse |
AF: AFERMS |
New |
Description We preload issues in order to speed up issue times for aircrews. We also have multiple warehouses that may start an issue at the same time for the same member. for instance a member is going on a flight, he needs a chem from one warehosue and a weapon from another on hte same base. these would both be started before the member got there
Recommended make it possible to have an issue open in more than one warehouse at the same time.
Mission Critical highly important. aircrews have compressed preflight schedules and literally every second saved counts.
Benefits reduced time for issue. Able to complete an issue even if one is open in another warehouse.
Users all |
|
|
01084 |
QC button disappear |
Warehouse |
AF: AFERMS |
Removed |
Description It is difficult to tell what has been QCd. The QC button stays on everything.
Recommended make the QC button disappear if an inspection has a QC assigned or completed. If it is canceled make the button reappear. Do not make the button show up on QC insp types.
Mission Critical desirable
Benefits would alleviate confusion
Users all |
|
|
01083 |
QC creation extra clicks |
Warehouse |
AF: AFERMS |
Done |
Description when adding an inspection there are extra clicks
Recommended after adding the stock number clicking next button I should not have to click select items to get the grid to populate. this should be a gimme when I click next.
Mission Critical desired
Benefits time savings reduction of click
Users all
Completed - Release 5.1 - 28 April 2017 |
|
|
01082 |
QC major and corrective action |
Warehouse |
AF: AFERMS |
Removed |
Description QC discrepancies grid - we do not have a check box to differentiate between a MAJOR and a minor discrepancy. in addition, we have to add extra discrepancy lines in order to input corrective action.
Recommended add column to the discrepancy that has check boxes and column header "Major" In addition, add a column that is editable by anyone performing the inspection "corrective action". on the QC Summary report add a category of "Major discrepancies" add a "major" column on the discrepancy report. see attachment
Mission Critical critical. A major write-up is something that needs to be highlighted because it could cause injury or death.
Benefits full compliance with Air Force Instruction 11-301v1
Users all |
|
|
01081 |
QC save results clicks |
Warehouse |
AF: AFERMS |
Removed |
Description QC/Inspection: when I click "save inspection results" I have to then click cancel to get the window closed. not only is this an extra step, it is confusing because people are afraid they will cancel what they just did.
Recommended when I click "save inspection results" it should close the window like it does when I click "mark QC/Inspection Request as Complete"
Mission Critical desired
Benefits less confusion, less clicks
Users all |
|
|
01080 |
QC check select for insp |
Warehouse |
AF: AFERMS |
Done |
Description We have inspections of life preservers where we sign of 100 items at a time. we are only required to QC 10%. we have to click remove on 90 life preservers when we edit the QC before completion.
Recommended instead of waiting until all of the items have been added give us a selection check box at QC creation. I could then click ten life preservers instead of removing 90. see attachment
Mission Critical leaning towards critical.
Benefits time savings.
Users all
Completed – Release 7.2.00 – 8 November 2019 |
|