00682 |
Return Managed SKO as full kit |
Warehouse |
DFAS Columbus |
Done |
Description Unable to create a "component list" template because the system will not accept serial number tracked line items. When attempting to save the template the system pops up code 2648. There is no way to have visibility on sets that contain serial tracked items.
Recommended The option to produce a DW Form 04 that shows the breakdown of the issued component so that it may be inventoried by the member signing for custody and by the issuing command when it is returned.
Mission Critical Mission critical for most units under NECC who issue containerized "kits" of equipment; most kits are serialized. The current system used for reporting readiness (RCRP) has full kitting visibility via it's Equipment Set Management module.
Benefits Major improvement in both accountability and accuracy.
Users ALL commands under NECC would be affected and without this functionality, it is doubtful that DPAS WHM will be adopted by the force. |
|
|
00681 |
Form DW04 - Provide content visibility for kits |
Warehouse |
DFAS Columbus |
Done |
Description Loss of visibility on serial items assigned to a kit when changing custody. DW Form 04 shows a single serialized kit number for the member to sign for but there is no content breakdown so if items are lost on return, there is no proof that the missing items were ever assigned. Component lists cannot be used if any line items contained in the kit are serial number tracked. Unable to view the kit contents once it has been issued where non-issued kit contents can be viewed using the update serial kit module under material management. Major issue with accountability as the kit contents virtually "disappear". Kit content visibility should be a basic functionality in this program.
Recommended The option to produce a DW Form 04 that shows the breakdown of the issued kit so that it may be inventoried by the member signing for custody and by the issuing command when it is returned.
Mission Critical Mission critical for most units under NECC who issue containerized "kits" of equipment; most kits are serialized. The current system used for reporting readiness (RCRP) has full kitting visibility via it's Equipment Set Management module.
Benefits Major improvement in both accountability and accuracy.
Users ALL commands under NECC would be affected and without this functionality, it is doubtful that DPAS WHM will be adopted by the force. |
|
|
00680 |
M&U - Limit Technician ESD Update |
MU |
USMC |
Removed |
Description On the Work Order Basic Tab, the Est Service End Dt is driven by the receipt date in conjunction with the selected priority cd of the work order. If the W/O is past due upon selecting an approval date, an error message is given stating the est service end date must be => the approval date. The est service end dt has to be changed by M&U supervisor which negates the original priority cd given.
Recommended The M&U user should not be able to change the Estimated Service End Date
Mission Critical
Benefits Improves/Accuracy/ Accountability
Users
Joe Stossel comment, 8/10/2015 -work with 684 and 706 to ensure they agree.
07Dec2018 – cancelled per Deric Sims No longer needed due to past enhancements. |
|
|
00679 |
M&U - Work Order Prep for Ship Code |
MU |
USMC |
Removed |
Work Orders are coming over to M&U with a W/O Reason of Prep For Shipment without a prep for shipment cd. We can force them to select one, have one of the selections No Prep for Shipment, agency or user preference setting. Customer priority: 3 |
|
|
00678 |
Gain Serialized Item |
Warehouse |
USMC: DMC |
Done |
Description During ADHOC testing of the DPAS-WM we attempted to perform an inventory gain as if for the purposes of having found an item during a directed inventory. The DPAS WM will not allow for the user to add material to the system other than through the receipts process. There are cases where it is DOD order to add material for other than receipted for reasons.
Recommended The system must have the functionality to add material via the Inventory manager update process for gains associated with physical inventories. The lack of functionality on this end forces the user to ad the material via receipt only, which puts out a different SCS transaction than what is required.
Mission Critical Yes, without this functionality DPAS-WM users will have to perform receipt transactions for gains associated with a physical inventory. While there is functionality to get the material in the system, this violates USMC policy on physical inventory.
Benefits This update makes the DPAS-WM conform to USMC policy and allignes with SCS Financial Reporting requirements for gained and lost equipment.
Users Adding this functionality will benefit the entire DPAS community.
Completed - Release 3.0 - 15 May 2015 |
|
|
00677 |
M&U - Single Move Requests |
MU |
|
Removed |
Work orders (New Receipts/Before Maintenance) are being sent to Material Movement and M&U simultaneously. This creates the potential for there to be two move requests in the system at the same time for the same asset. One request being system generated going to the stowage location and one request being generated by M&U to move asset to a Maintenance Location. Work Orders should not populate the M&U module until Transportation updates the system showing the asset as being on a stowage location. Requestor - Van Weaver |
|
|
00676 |
Remove QC and NID from M&U W/O |
MU |
USMC: DMC |
Done |
Description When updating a COSIS W/O with a status code of pending close and a state code of completed awaiting inspection, an error is received stating that a inspection status code is mandatory. This is not done in maintenance.
Recommended The accepted or rejected status happens in Quality Control. This needs to be removed from M&U.
Mission Critical Yes. These are mandatory fields for the M&U personnel but are not M&U functions.
Benefits By implementing this change, the Maintenance supervisor will be able to update work orders with a pending, completed awaiting inspection status.
Users All
Completed - Release 3.0 - 15 May 2015 |
|
|
00675 |
Mass Edits of Missing Gear |
Warehouse |
USMC: CSP |
Done |
Description Non-standard returns, missing gear statements, custom (non-unit issue list) transactions are one at a time and are time consuming. This process needs to be improved. This is critical prior to DPAS implementation at Camp Lejeune and beyond. This comes down to clickology in the system. It is overly burdensome to process a large individual issue return, when there are many missing items, and other issues to deal with.
Recommended It is requested that DPAS/LEIDOS provide the capability to process missing gear statements for all items listed on the missing gear statement in Mass, thereby reducing the number of key strokes involved in completing the process.
Mission Critical Yes, this will significantly impact on our customer processing time. We cannot implement at Camp Lejuene and beyond without a smoother process in place.
Benefits Implementing this design request will reduce users time for processing transactions and members wait time to receive their receipts.
Users Yes, this will impact all of CSP DPAS users.
Completed - Release 3.0 - 15 May 2015 |
|
|
00674 |
Spreadsheet Upload Process for OCS, TBS, SOI, East and West |
Warehouse |
USMC: CSP |
Done |
Description OCS,TBS, SOI East/West classes provide rosters in advance to the IIF. All of OCS and 80 % of TBS students do not have CAC cards issued to them. At this time DPAS doesn't provide a way to upload these lists in a batch upload process. Each name has to be key punched one at a time.
Recommended Adding a Batch upload process for OCS,TBS,SOI East/West class rosters.
Mission Critical Yes, this is mission critical. With limited staff at OCS,TBS,SOI East/West IIF's it is critical to have a Batch upload process to save time.
Benefits Reduces Time/Cost.
Users Yes, this will impact 80% of CSP DPAS users.
Completed - Release 3.0 - 15 May 2015 |
|
|
00672 |
Freeze Headers on All Screens |
Warehouse |
USMC: CSP |
Done |
Description In the columns that are displayed in each DPAS menu screen, need to have column headers and left to right scroll bar freeze on screen when scrolling up and down.
Recommended Freeze column Headers and all screens.
Mission Critical Not mission Critical but would greatly enhance ability for the USER to know which column is which when looking at screens with more than 10 rows of data.
Benefits Improves Accuracy when looking at screens with more than 10 rows of data.
Users Yes, this will impact all of CSP DPAS users.
Completed - Release 3.0 - 15 May 2015 |
|