Unlike submitted Support help tickets, System Change Requests (SCR's) can only be submitted through your organization's appointed and authorized ELMS CCB member representatives, or otherwise if no CCB representatives have yet been appointed, your Primary Information Owner appointee. If you are unsure of who your organization's appointed ELMS CCB member representatives or Primary IO are, you may email the ELMS Support team to request that information:
To learn more about the process, please visit our CCB Responsibilities and Meetings page. Below you will find all SCR's that have been submitted, and what their status is. To download a blank form, you may visit our Reference Library and download the SCR Form.
Utilize the search filters below to narrow your results by keywords, module, or state. You may also request an Excel file of all the SCR data by contacting the Help Desk.
| Found: 1807 Result(s) | Show: |
| Title |
ELMS Module |
Reporting Org |
State |
Description |
Action |
|
|---|---|---|---|---|---|---|
| 02134 | Filtering Process for PIEE WAWF Receipt Transactions | PA,Warehouse,Materiel Management | Leidos | New | Change Request: New System Process
Description: The setup of PIEE WAWF for the ELMS user must be performed within PIEE. 1) Often times the APO doesn't know who their WAWF coordinator is, 2) the setup isn't specific enough to prevent non-property book receipts from passing to ELMS causing review / deletion of unwanted Due Ins, and/or 3) it requires constant WAWF configuration maintenance between the Accountable Property Officer (APO), and their WAWF coordinator to tweak the WAWF setting in an attempt to receive the desired receipts. Recommended:
Create a WAWF filter process on the ELMS side that will provide the APO a filtering process to filter in / out receipts they want to see as Due Ins in PA and/or Warehouse. Once in place, ELMS will enable 100% of the organization's WAWF receipts to flow to ELMS using the ELMS WAWF filtering rules established by the APO to determine which receipts will become a Due In. ELMS will also provide the APO with a view of those receipts that were filtered out and allowing the user select ones that should have created a Due In to be processed into a Due In. Mission Critical: This change incorporates additional PIEE WAWF functionality within ELMS. Benefits: This change will provide improved integration between PIEE GFP and ELMS (APSR).
Frequency: Daily Users: All ELMS users that use the PIEE WAWF interface. |
|
| 02133 | PIEE GFP Business Process Improvements | PA,Warehouse,Materiel Management | Leidos | New | Change Request: New System Process
Description: PIEE GFP is adding functionality that will enable it to report to the material owner's Accountable Property System of Record (APSR) such as condition code changes and disposition actions via the DLMS 947I Inventory Adjustment Transaction Set. See DEDSO's website for the DLMS 947I Implementation Convention. Recommended:
Modify ELMS to accept the DLMS 947I from PIEE GFP and update / remove the material from DPAS. This change will require locating the item in ELMS (PA, WM or MM) and performing the action plus all sub actions to include reporting the financial change should item be financially reportable. Mission Critical: This change incorporates the additional PIEE GFP functionality within ELMS. Benefits: This change will provide improved integration between PIEE GFP and ELMS (APSR).
Frequency: Daily Users: All ELMS user with GFP. |
|
| 02132 | Intransit Document Review and Verification - 1b | Materiel Management | USMC | New | Change Request: Process Improvement
Description: Current ELMS processes do not provide the end user with serial number detail within the In-Transit Review process to search for and close intransit shipments with an approval process. When documents are sent to an outside entity that cannot reply transactionally confirming receipt of a shipment, it is the responsibility of the Inventory Manager, when Material Management (ICP) module is being utilized, to close out the intransit record once the Key Supporting Document (KSD) is supplied. The in-transit review process will need to have serial number detail to facilitate the processing and closeout of shipments. Serial number level details are specifically needed for instances where the confirmation quantity does not match the shipment information (Either with KSD or Responses that are short). Recommended:
The ELMS system shall be enhanced to include a serial number search capability within the “Intransit Review” screen, allowing users to locate and verify specific intransit records. Upon selection of a shipment, all associated serial numbers will be displayed, automatically checked upon first entry. Users will have the ability to uncheck serial numbers not verified as received based on the Key Supporting Document (KSD). A new Stage Code “DS – Discrepant Shipment” is requested to flag and clearly display discrepant serial numbers or quantities. This is a critical enhancement, as current functionality lacks the capability to drill down by serial number for intransit shipment verification and closeout. This feature is necessary to enable Inventory Managers using the ICP module to validate and close shipments when transactional confirmation is not available, ensuring compliance with audit standards. Refer to the attached USMC BRD for additional detail. Mission Critical: This process allows the user to properly adjudicate and confirm in transit shipments, when the receiving agency does not confirm receipt, or confirms receipt with errors or discrepant quantities. Benefits: -Meets MARCORLOGCOM’s business model.
-Ensures the accurate closeout of in-transit shipments based on Key Supporting Documents received at external RSA's, DLA-DS, or other entities that do not respond appropriately via DLMS Transactions.
Frequency: Daily Users: This SCR will support all users of DPAS Material Management, and clean up an issue with the validation of serialized assets when the quantities do not match between what was shipped and the KSD Received. |
|
| 02131 | TAC Code AUD Table - 1b | PA,Warehouse,Materiel Management,Enterprise | USMC | New | Change Request: Process Improvement
Description: ELMS currently does not allow for Transportation Account Codes (TAC) value set to be added to, updated, or values deleted from within the Material Management (MM) module. Inventory Manager (IMs) are often provided TAC codes to be used when redistributing inventory to other services or other entities from within the Marine Corps. The ability to add, update, and delete TAC codes is inherently the responsibility of the IMs using the Material Management module. Recommended:
The ELMS Material Management (ICP) module shall enable Inventory Managers to Add, Update, and Delete Transportation Account Codes (TACs) within a controlled value set. Once valid TACs are available, managers can select a TAC when generating a 940R Material Release, which will be embedded in the transaction (segment N9, code "TH") and transmitted to the appropriate Remote Storage Activity (RSA) for further distribution. TAC control remains with the ICP when warehouses are linked. Refer to the attached BRD for additional details. Mission Critical: This process improvement is to allow for the USMC Enterprise Help Desk to make quick updates to the TAC Code to support emerging mission requirements. The DPAS Support help desk ticket to add a TAC Code has been determined pose risks to MARCORLOGCOM Weapon System Managers meeting mission timelines, and hence a User Update Process for this field is required. Benefits: -Meets MARCORLOGCOM’s business model. -Ensures timely processing of shipments in support of Global Force Management and Contingency requirements, that require the quick update of TAC Codes.
-Ensures Accuracy of TAC Code Submissions to support interface with DLA Transportation Systems. Frequency: Daily Users: All MARCORLOGCOM Material Managers, and other DPAS Users who will use this process. |
|
| 02130 | ELMS Synchronization of Disconnected Environments | PA,MU,Warehouse,Materiel Management | Leidos | New | Change Request: New System Process
Description: Disconnected ELMS instances currently lack a scalable and reliable method to exchange data with the enterprise system. This limits both the reporting of maintenance activity and the visibility of asset data at the enterprise level, which is critical for decision-making and readiness tracking. Recommended:
Recommend implementing a Data Warehousing layer to act as a central hub for integrating and synchronizing data from both connected and disconnected ELMS instances. This would be supported by a synchronization process to export, encrypt, and transmit data from a disconnected ELMS instance, then decrypt, validate, and apply updates to an Enterprise ELMS instance. The same process would support downstream updates, such as catalog changes, to disconnected environments. Mission Critical: This is a new system process involving architecture enhancements, data synchronization routines, and visualization/dashboard capabilities for enterprise-wide maintenance and asset visibility. Note: This SCR is to develop a prototype for 2-way communication between the ELMS enterprise and disconnected copies of ELMS running in their environment. The success of the prototype will determine whether the functionality will become an operational element of the ELMS environment. Benefits: The proposed solution supports disconnected operations while enabling timely, secure, and controlled data exchange with the enterprise system. It provides a foundation for enhanced visibility, cross-service analytics, and future expansion while simplifying system-to-system communication and improving the scalability of ELMS architecture.. Frequency: Daily Users: This SCR should it go to production could impact all users of ELMS. |
|
| 02129 | Updating Corrosion Scoring Fields | MU | USAF | New | Change Request: Process Improvement Description:
TO 35-1-3 CORROSION PREVENTION AND CONTROL, CLEANING, PAINTING, AND MARKING OF USAF SUPPORTEQUIPMENT (SE), Chapter 3 requires new paint and paint scoring to be documented. The current system issue e run into is that DPAS M&U only provides four predefined paint color options for corrosion scoring, which limits flexibility when tracking non-standard coatings. Additionally, the field units are getting confused on scoring documentation with only a Last Painted Date field available. This confusion and lack of documentation makes it difficult to track the most recent corrosion assessment separately from the last painting event. Proposed Improvement:
Add an "Other" option to the corrosion scoring paint color selection, allowing users to account for additional coatings not covered by the existing four options.
Change "Last Paint Date" field to read "Last Scoring Date" to reduce confusion for the field and accurately record the most recent corrosion assessment, improving tracking and maintenance scheduling.Recommended:
Add an "Other" option to the corrosion scoring paint color selection, allowing users to account for additional coatings not covered by the existing four options.
Change "Last Paint Date" field to read "Last Scoring Date" to reduce confusion for the field and accurately record the most recent corrosion assessment, improving tracking and maintenance scheduling. Mission Critical:
The current DPAS M&U system only provides four predefined paint color options for corrosion scoring, which does not accommodate all possible coatings. We have received multiple requests to expand these options since the existing selections do not cover all use cases. Adding an "Other" option will allow users to input coatings that do not fit within the preset choices, improving accuracy in tracking corrosion treatments. Additionally, the field units are getting confused on scoring documentation with only a Last Painted Date field available. This confusion and lack of documentation makes it difficult to track the most recent corrosion assessment separately from the last painting event. Changing "Last Paint Date" field to read "Last Scoring Date" to reduce confusion for the field and accurately record the most recent corrosion assessment, improving tracking and maintenance scheduling. These changes will ine up DPAS M&U documentation with requirements in TO 35-1-3 CORROSION PREVENTION AND CONTROL, CLEANING, PAINTING, AND MARKING OF USAF SUPPORTEQUIPMENT (SE), Chapter 3, requiring new paint and paint scoring to be documented and repainting of SE for purely cosmetic reasons is prohibited Benefits:
Improved Data Accuracy – Adding an "Other" option for paint colors ensures that all corrosion coatings can be properly documented, preventing inaccurate or incomplete entries. Enhanced Maintenance Tracking – The "Last Scoring Date" field will allow for better differentiation between corrosion assessments and painting events, leading to more precise tracking of maintenance history.
Better Decision-Making – More accurate corrosion data helps maintenance personnel make informed decisions on when additional treatment or repainting is necessary, improving asset longevity.
Increased Flexibility – Expanding paint color options prevents users from being forced into selecting an inaccurate color, making the system more adaptable to real-world scenarios.
Compliance and Readiness – Proper documentation of corrosion assessments supports preventative maintenance efforts, ensuring assets remain in operational condition and reducing unexpected failures. Frequency:
Daily
Users:
The inquiry process is used by 100s of users multiple times a day. |
|
| 02128 | Update DRRS Report File to include MU Data | MU | USAF | New | Change Request: Policy/Regulatory Description:
Current DPAS data push to DRRS is limited to data from PA and FSM modules, providing on hand and authorized quantities(S ratings). FMC and NMC data is not being fed to DRRS, resulting in inaccurate data for R ratings. Manual data is being entered due to the information not feeding into DRRS.
Recommended:
Update report to incorporate M&U feed for FMC/PMC/NMC rates. Rates should be a roll-up of UIC and Stock Number. Asset data should reflect total number of FMC/PMC/NMC status based on Stock Number and UIC.
Mission Critical:
Per CJCSI 3401_02B, page C-11, section c. Equipment Condition (R-Level), it states units will report the lowest equipment condition level between designated combat-essential equipment and designated support equipment. (Requirement also IAW DAFI's 10-201 & 10-401) Benefits:
Supports mandatory DRRS reporting and eliminates disparity from users manually entering FMC/NMC data. Strengthens Air Force Enterprise visibility of Readiness posturing. Frequency:
Weekly
Users:
This change will be applicable to 15,000+ users assigned to Site FH-AFHAF, as well as other agencies or departments that utilize Support Equipment assets in DRRS. |
|
| 02127 | WRM Maintenance Attribute | MU | USAF | New | Change Request: Process Improvement Description:
MU assets that are in War Readiness Materiel (WRM) status are not identified and segregated from the standard mission support assets. Air Force policy requires WRM assets to be maintained separately and sustained using WRM funds, not O&M funds used to maintain the regular equipment fleet. MU does not provide an indicator alerting users to the assets WRM status, nor the ability to search assets in that status.
Recommended:
Create a maintenance attribute for WRM, similar to the Mission Critical and Nuclear Certified attribute currently available in the Maint Asset Master. WRM attribute indicator should be visible on the work order alerting the user to the assets status. Additionally, the attribute should be available as search criteria in the Maint Asset and Work Order inquiries, as well as be included in the Advana (LIMS/BLADE) data feed.
Mission Critical:
Per DAFI 25-101, War Readiness Materiel, WRM support equipment will be managed in the AF Maint Information System (AvSE MIS), maintained separately from the base support equipment, repaired and maintained using WRM funds. Benefits:
The change will allow the Air Force to effectively manage it's WRM fleet, ensuring correct maintenance actions and proper expenditure of funds. With the delineation of assets within the AvSE MIS, the ultimate impact will be strengthening war readiness posturing and eliminating the risk of misappropriation of funds. Frequency:
Daily
Users:
This change will be applicable to 15,000+ users assigned to Site FH-AFHAF, as well as other agencies or departments that manage WRM assets. |
|
| 02126 | Mass Appropriation Update Interface Code Improvements | PA | Leidos | New | Change Request: Process Improvement Description:
Mass Appropriation Update only supports moving to fund codes that follow the same interface system code. Most Accounting systems require cost elements that do not lend them to an automated transition from one accounting system to another. The AY (no automated interface) and AG (GAFS-R) accounting interface does not require cost elements, thus the Mass Appropriation Update process should permit the user to update the interface system code when the from or to is either AY or AG.
Recommended:
Update the Mass Appropriation Update program to allow users to update DPAS supported accounting interfaces to accounting interface cd of "AY" (No Automated Interface) or AG (GAFS-R) .
Mission Critical:
Mass Appropriation Update currently exists but is limited by its current design. This change will enable users to perform the update without customer support / scripting by the DPAS support teams. Benefits:
Users can handle mass appropriation updates that involve AY or AG without having to request scripts that have the possibility of handling thousands of transactions. The functionality is already largely in the program, it just needs improved to support different accounting interfaces. Frequency:
Daily
Users:
Many users use this program and can use it at any time. The job runs daily through queued appropriation updates. |
|
| 02125 | LDAC Data Modification | PA,Warehouse,Materiel Management | US Army | New | Change Request: Process Improvement Description:
LDAC is requesting a modification of the data elements we are currently getting daily from DPAS. These additional data elements are required to start the development / enhancements of the Asset Visibility and Supply Viewer modules in Decision Support Tool (DST). These enhancements were directed by Assistant Secretary of the Army (Acquisition,Logistics, and Technology) ASA(ALT), Headquarters Department of the Army and the Army Materiel Command Commanding General approved on the DST 1 to N List.
Recommended:
LDAC is receiving Unique Item Tracking data daily from DPAS: WE WOULD LIKE TO ADD THESE ADDITIONAL DATA ELEMENTS: Document Identifier Code (DIC)l; Document Number; NSN; Nomenclature; Quantity, LIN; Unit Identification Code (UIC); Unit of Issue; Status Code; Ship to DODAAC; Ship from DODAAC; Estimated Shipment Date; Storage location (SLOC); Ship from RIC; Ship to RIC; Gaining UIC Serial number and Losing UIC.
Mission Critical:
Army Regulation (AR), AR710-2, AR735-5, AR770-2 par 1-6; par 1-13; Decision Support Tool is the Army's authoritative source for the distribution / redistribution of the allocations to the unit identification code (UIC) level of detail. The DST is the Army's collaborative tool used to synchronize the distribution and redistribution of equipment and materiel in accordance with Army priorities. OPERATION ORDER, 24-231, U.S. Army Materiel Command Implements Auditable Presidential Drawdown Authority Article Transfer Accountability and Tracking Processes Benefits:
LDAC will be able to provide advance Asset Visibility of the stocks/assets are being transfered from the DPAS warehouse to the Army New Equipment Fielding Facility (NEFF) site for distribution. This will aid in the coordination synchronization at these NEFF sites for Units receiving new equipment, facilitates training, and prepares vehicles for installation of weapons platform at these facilities prior to hand off. Provides end to end In-Transit Visibility of asset the are in the Supply Chain as required by the Presidential Drawdown Closure of Proposed Sourcing Decisions (PSDs) in DST via DST automated processes. Frequency:
Daily
Users:
DST currently has 64,355 active users. High Priority. |

Please be advised that Navy Property Accountability module users will be unable to access ELMS during the period beginning 3pm EST on Tuesday September 29th, until 8am EST on Friday October 2nd due to the annual EOFY lockout period. If you have questions, please direct them to the Navy PP&E Management Support Office via their centralized email inbox, which is
Please be advised that ELMS will be unavailable beginning Friday, October 2nd at 9:00 pm EST for server maintenance. Estimated downtime is stated to last up to 60 minutes in length - please plan accordingly.