Unlike submitted Support help tickets, System Change Requests (SCR's) can only be submitted through your organization's appointed and authorized ELMS CCB member representatives, or otherwise if no CCB representatives have yet been appointed, your Primary Information Owner appointee. If you are unsure of who your organization's appointed ELMS CCB member representatives or Primary IO are, you may email the ELMS Support team to request that information:
To learn more about the process, please visit our CCB Responsibilities and Meetings page. Below you will find all SCR's that have been submitted, and what their status is. To download a blank form, you may visit our Reference Library and download the SCR Form.
Utilize the search filters below to narrow your results by keywords, module, or state. You may also request an Excel file of all the SCR data by contacting the Help Desk.
| Found: 1779 Result(s) | Show: |
| Title |
ELMS Module |
Reporting Org |
State |
Description |
Action |
|
|---|---|---|---|---|---|---|
| 02246 | "X", "/" & "-" Symbol Use | MU | USAF - FH-AFHAF | New | Change Request:
Policy / Regulatory Description:
Per TO 00-20-1 and throughout the aircraft and equipment maintenance community utilizing red "X"; "-" "/" symbols on maintenance documents is to make system status instantly apparent. They indicate the condition, fitness of operation, servicing, inspection, and maintenance status of the aerospace vehicle or equipment. The Red X represents the most serious possible condition. This will also make the MIS consistent with AFTO 244 documentation requirements, IAW TO 00-20-1. Non-use of symbols creates a safety issue as symbols inform operators of the condition of the equipment whereas FMC, NMC, & PMC are used to indicate a status to equipment owners/maintainers and higher level leaders for decision making and data mining. Recommended:
Within the M&U module, add the following symbols in Red colored font: "X"; "-" "/" documentation capability to indicate condition of equipment via work orders. Create a toggle at the Maintenance Program Level to select "Use of Symbols". Once selected, the ELMS 244 will not read FMC, PMC, or NMC, but X, /, - and an additional field will be populated in the Sub-Work Order for the symbol. Logic behind the symbols will need to be set at the Sub Work Order level: NMC of any variant = "X", PMC = "/" and FMC work orders need to have the option of "/" or "- " set by the user.
Mission Critical:
DAFI 21-101, AFTO 00-20-1
Benefits:
This will allow AFTO Form 244 documentation to meet current technical order 00-20-1 and AFI requirements and provide users the ability to immediately identify the condition of support equipment, mitigating the safety issue; aligns with the acft mx community's standardization of using symbols on maintenance documents to make important notations instantly apparent. Frequency:
Hourly
Users: Approximately 12K ELMS M&U users and maintenance personnel utilizing equipment within the AvSE functional community will be affected. The total number of work orders/transactions is dynamic (open/closing work orders).
|
|
| 02245 | MRO Pending Allocation | Materiel Management | NSWC | New | Change Request:
New System Process
Description: When you process a Customer Requisition that comes into the ICP during the RSA selection process, you are only given the available quantity. Users are unable to determine if previous MRO's have been sent over for the same stock number and for the same RSA to determine if there will be enough available quantity to fill that customer requisition. Recommended:
Provide an additional column in the RSA selection process that would include something called "Pending Allocation" for example. This quantity would be provided from the total "Expected Qty" located in the MRO grid of that RSA for that stock number.
Mission Critical:
N/A
Benefits:
This implementation will streamline a process where the user currently has to go back over to the WH module, review their MRO results grid, query a stock number and add up the expected quantity already sent over to be filled. Then either refer to their inventory in the WH or got back to the ICP, into the customer requisition. select the RSA once again to see what the available quantity is. This new data field would allow the user to make the determination whether to have a warehouse fill the requisition or refer it off station immediately. Frequency:
Hourly
Users: All ICP Users |
|
| 02244 | ISSUE/RETURN CAC SIGNATURE OPTION | Warehouse | NSWC | New | Change Request:
New System Process
Description:
The existing workflow for securing digital signatures is labor-intensive: users must manually download documents as PDFs, insert signature blocks, facilitate individual signing, and then re-upload the finalized files to ELMS. This multi-step process creates significant administrative lag. Recommended:
Enable secure digital signing for all issue and return forms (Individual, Unit, and Warehouse) using a DOD CAC reader for signing the transaction. Similar to using a signature pad the digital signature will stay on the issue/return record.
Mission Critical:
N/A
Benefits:
This implementation will significantly streamline equipment processing times, accelerating the turnaround for Individual, Unit, and Warehouse transactions. Frequency:
Hourly
Users:
All Users |
|
| 02243 | Property Allocation Research | Warehouse | DLA - LESO | New | Change Request:
Process Improvement
Description:
The LESO requires a systematic research process to prevent the over-allocation of excess property to Law Enforcement Agencies (LEAs) in the DoW 1033 program. A lack of visibility into past and current property transfers creates a risk of improper allocation and inefficient resource management Recommended:
See Attachment (ELMS SCR - Allocation_Report.docx) Mission Critical:
LESO MOU; EO14288; DODIG-2020-129 (Project No. D2020-D000AT-0021.000);
Benefits:
Enhanced Accountability and Compliance; Improved Resource Management and Efficiency; Strengthened Program Integrity and Public Trust; Data-Driven Decision Making; Mitigation of Risk
Frequency:
Daily
Users:
This is a high-volume function utilized multiple times per day. The exact frequency is dependent on the daily number of incoming requests and transfers that need to be processed. Number of users will depend on the number of users at the Site and LP levels |
|
| 02242 | AFTO 244 Alignment | MU | USAF - A4/HAF FH-AFHAF | New | Change Request:
Policy / Regulatory
Description:
The current automated version of the AFTO Form 244 does not fully comply with Air Force policy requiring accurate documentation of maintenance and inspections on aviation support equipment (ASE) as outlined in TO 00-20-1 and AvSE Interim Guidance. Current guidance requires the phase out ELMS auto-generated 244 and use of DAF AFTO 244 upon completion of inspection or requiring new DAF AFTO 244 whichever comes first. Specifically, it does not allow for proper inclusion of status symbols or the documentation of partially mission capable (PMC) conditions, which are essential for tracking ASE readiness and serviceability. Recommended:
A SCR is underway to incorporate PMC status and additional capabilities into the automated AFTO 244. It would be beneficial to align the automated output with the AFTO 244 with the requirements set forth in TO 00-20-1, would improve accuracy and reduce the risk of documentation errors. Additionally, work plan description and work order data fields should be aligned to populate the AFTO 244 with the Service Requested as documented in the work order. This will provide a more detailed description of the discrepancy listed on the AFTO 244. See attached examples
Mission Critical:
The requirement to utilize an AFTO 244 form is referenced in AvSE MIS Interim Guidance and is referenced in TO's 00-20-1, 00-20-2 and DAFI 21-101
Benefits:
Standardization of the form would improve accuracy and reduce the risk of documentation errors for field personnel utilizing the automated and official DAF AFTO 244 form, AvSE MIS Interim Guidance requires use of DAF AFTO 244 and phase out of auto-generated ELMS 244.
Frequency:
Hourly
Users:
8.5K personnel utilizing maintenance information system, leadership w/in Quality Assurance positions inspecting proper/compliant usage, and form is reviewed prior to utilizing Form 244's respective equipment. |
|
| 02241 | Add Document Unit Price to Inventory Transaction Inquiry | Materiel Management | USCG | New | Change Request:
Process Improvement
Description:
The Uniform Distribution Center (UDC) users rely on the Inventory Transaction Inquiry on the ICP side to support end of month inventory reporting. Currently, this inquiry only displays the Unit Price, which does not always reflect the actual document unit price used at the time of the transaction. As a result, UDC personnel must navigate to Warehouse module ro locate the document unit price and do manual calculations, creating inefficiencies and increasing the risk of reporting discrepencies.
Recommended:
Add Document Unit Price as a selectable grid option within the Inventory Transaction Inquiry.
Mission Critical:
N/A
Benefits:
Implementing this solution would eliminate the need to cross reference the warehouse module and provide a single authoritative source for reporting.
Frequency:
Weekly
Users:
USCG users |
|
| 02240 | Manual Close-Out In-Transits Capability | Registry (SA/LW) | SOCOM | New | Change Request:
New System Process
Description:
The registry currently does not have the capability to manually close out In-Transit Registry Assets. This is required as there are many in-transits shipments that are not being auto-closed. Presently, SOCOM Registry does not reflect an accurate status of Small Arms/Light Weapons serial number data at the USSOCOM Registry.
Recommended:
System should allow capability to manually update in-transits for shipments that are already received by the gaining unit and verified by the designated SOCOM user. SOCOM requests a Manual Close-out capability in Registry similar to the manual update function at ICP with the ability to attach supporting transaction documents.
Mission Critical:
To follow DLMS 4000-25, Volume 2, Chapter 30 C30.5.1.2.3. DoD Components must establish active, inactive and historical records of all SA/LW to include those previously under custody/ ownership. All SA/LW records must be retained in accordance with the National Archives and Records Administration (NARA). The history of weapons must be readily available to respond to FOIA requests, law enforcement inquiries, or any other official request from an authorized organization
Benefits:
-This change will enable ability to reconcile assets status at USSOCOM Registry
-This change will eliminate help desk ticket requirements to make changes to Registry
-USSOCOM Registry will serve as one stop module for weapons FOIA inquiries requestFrequency:
Daily
Users:
Recommend change to Registry Agency Manager Level Role to enable manual closeout process for In Transit Weapons transactions that USSOCOM has confirmed receipt of by either gaining customer, or the gaining Warehouse activity. |
|
| 02239 | ADVANA Data Feed Update | PA,MU,Warehouse,Materiel Management,FSM,Registry (SA/LW) | SOCOM | New | Change Request:
Process Improvement Description:
Expansion of data fields from ELMS available to ADVANA, the current USSOCOM data feed is limited to the On Hand/Asset Visibility Data
Recommended:
Provide data elements as indicated on attached Excel Document. This will expand the ELMS data available to ADVANA for USSOCOM Data Dashboards and decision making
Mission Critical:
Supports USSOCOM ability to meet its Title X, U.S.C. Sec. 164 & 167 responsibilities. Supports USSOCOM compliance of DoDD 8190.01E, DLM 4000.25, DoDI 4140.01, DoDI 5000.64, DoDM 4140.01 V8, DoDM 4140.01 V11, DoDI 4161.02, FMR 7000.14, FAR & DFARS, and FIAR initiatives. Benefits:
Enables USSOCOM to meet its Title X, U.S.C. Sec. 164 & 167 responsibilities.
Frequency:
Daily
Users:
All ADVANA users of the USSOCOM SPARTA enclave |
|
| 02238 | Add new data fields to catalog and DLMS 832N transaction. | Materiel Management | USAF | New | Change Request: Policy/ Regulatory
Description:
DLMS ADC 1510 provides new data fields for the DLMS 832N transaction - added are the reportable method for OM&S and the weapon system variant. Need ELMS to add the new data fields to the catalog and to the 832N and include in DLMS transaction processing (including 824R reject transaction).
Recommended:
Make necessary changes in the ICP module process and correctly handle the reportable method of OM&S and the weapon system variant. Users will see new data in the DLMS transaction viewer and ELMS will include these new data elements in the DLMS 824R Reject notification process.
Mission Critical:
ADC 1510 signed 2/5/2026 Benefits:
The added data elements within the 832N will allow the services to determine their reportable methodology for OM&S and any subsequent 824R Reject notifications to AF CICPs.
Frequency:
Weekly
Users:
AF GFM-A users and other services reporting OM&S |
|
| 02237 | SKO Catalog | Warehouse | ARMY ASA(ALT) | New | Change Request: Process Improvement
Description:
In the current Warehouse module, there is no functionality to add stock numbers that were not originally designated as Kits to the SKO Catalog. The existing rule set dictates that if any verified transactions—regardless of their state (open or closed)—exist for a stock number where it was treated as a normal end item, that stock number cannot later be designated as an SKO Header in the SKO Catalog.
This restriction applies to all transaction types, including receiving transactions. For example, if assets were ever received into the Logistics Point (LP) under a stock number as normal end items, the act of receiving those assets permanently prevents that stock number from being converted into an SKO Header in the SKO Catalog, even if the inventory associated with that stock number is subsequently removed. This limitation ensures consistency in the system but may require additional planning when managing stock numbers intended for SKO use. Recommended:
Enable the capability to utilize previously used stock numbers, even those with historical records as assets categorized as end items, as SKO Headers within the SKO Catalog. This functionality would provide greater flexibility in managing stock numbers, allowing them to be repurposed for kitting processes while maintaining consistency and traceability in the system.
Mission Critical:
Army Regulation (AR) 700-18: Covers logistics and supply chain management, including kitting processes.
DoD Instruction (DoDI) 5000.88: Provides guidance on engineering and configuration management.
MIL-STD-973: Establishes standards for configuration management across DoD programs.Benefits:
Reducing this limitation enhances system flexibility while maintaining consistency, allowing users to fully meet the intent of various kitting functionalities. This improvement supports diverse configurations within the SKO process, enabling more efficient management and adaptation to evolving operational requirements.
Frequency: Daily
Users: All
|