|
01396 |
13A - MMIS |
Enterprise |
Army: ASA(ALT) |
New |
Description 13A = NEED THE ABILITY TO RECEIVE INPUT FROM MMIS FOR MWOS, AS WELL AS SEND THE NOTIFICATION OF APPLICATION INTO THE MMIS
Recommended
Mission Critical
Benefits Improves Accuracy Increases Accountability Decreases time
Users ALL |
|
|
01395 |
12A - FUNDING 1 |
Enterprise |
Army: ASA(ALT) |
New |
Description 12A = ASA(ALT) requires the ability to allocate different funding streams to PM mission activities. track cost in M&U by fund type and/or LOA
Recommended
Mission Critical
Benefits Improves Accuracy Increases Accountability Decreases time
Users ALL |
|
|
01394 |
11A - PRINT LABELS |
Enterprise |
Army: ASA(ALT) |
New |
Description 11A = The Army requires the capability to print/reprint barcodes (UII labels) with std info on 1348-1, 129 Pkg Label, 1387/1149, bin location, pick-ticket info, part for box, serial # for box, serial # for item
Recommended Add 129 Packaging Label and 1387 to already existing items.
Mission Critical No - Needed in order to minimize the amount of manual paperwork required
Benefits Reduces time Improves accuracy
Users All users within ASA(ALT) will benefit from this action. |
|
|
01393 |
10A - DLA Warehouse |
Enterprise |
Army: ASA(ALT) |
New |
Description 10A = Move PM inventory and visibility from DLA warehouse (item, project code to location)
Recommended Can DPAS support ADC 1198?
Mission Critical Mission Critical
Benefits Improves Accuracy Increases Accountability Decreases time
Users ALL |
|
|
01392 |
9A - PROJECT CODE |
Enterprise |
Army: ASA(ALT) |
New |
Description 8A = workflow process for project code changes
When ownership of an Army owned material needs to be changed, the inventory needs to be issued from the OWNER 1 TO OWNER 2 containing the current Owner RIC and received back into inventory containing the new Owner RIC. For storage locations that interface with DLMS (LMP, DLA, Contractors, and PM Staging locations that use third party software), the following transactions will be required. An outbound DLMS (A5_) should be generated to the storage location containing the current Owner RIC. (The ship-to (SUPP ADD) on the outbound A5_ should be the same as the storage site that the A5_ was sent to.) An outbound DLMS (DW_) should also be generated to the storage location to identify the new Owner RIC. An inbound DLMS (AR0) should be received in which will issue the inventory from the current Owner RIC. An inbound DLMS (D6_) should be received which will receipt the inventory into dpas under the new Owner RIC.
Recommended
Mission Critical Mission Critical
Benefits Improves Accuracy Increases Accountability Decreases time
Users ALL |
|
|
01391 |
7A - SKO |
Enterprise |
Army: ASA(ALT) |
New |
Description 7A = ALLOW MULTIPLE CONFIGURATIONS UNDER ONE MATERIEL NUMBER SKO PERMIT ONE ORGANIZATION TO HAVE A DIFFERENT SET OF QUANTITIES IN A CONFIGURATION THAN ANOTHER ORGANIZATION
Recommended
Mission Critical
Benefits Improves Accuracy Increases Accountability Decreases time
Users ALL |
|
|
01390 |
6A - AESIP |
Enterprise |
Army: ASA(ALT) |
New |
Description 6A = UPDATE EXCHANGE WITH AESIP TO EXPAND TO A 2-WAY EXCHANGE. SUBMISSION/RECEIPT.
- CHECK AESIP
- IF YES, ALLOW USE
- IF NO, CHECK FLIS
- IF YES, VALIDATE ARMY USER - GENERATE JLC FORM
- IF NO, REQUEST A MANP/MCN/NIIN AS NEEDED BY THE USER
- IF NEED TO REQUEST A MATERIEL NUMBER
- GENERATE CHECKLIST TO DETERMINE IF A "TEMPORARY MATERIEL NUMBER" CAN BE USED
- IF OUTSIDE A 90 DAY WINDOW - REQUEST EMAIL ADDRESS TO NOTIFY THEM WHEN PART AVAILABLE
Recommended OR SOMETHING LIKE THE ABOVE
Mission Critical
Benefits Improves Accuracy Increases Accountability Decreases time
Users ALL |
|
|
01389 |
5A - LMP DLMS |
Enterprise |
Army: ASA(ALT) |
New |
Description 5A = Require the ability to push and pull inventory from LMP (using project code inventory) using DLMS.
Recommended
Mission Critical Mission Critical
Benefits Improves Accuracy Increases Accountability Decreases time
Users ALL |
|
|
01388 |
4A - BULK LABELS READ |
Enterprise |
Army: ASA(ALT) |
New |
Description The Army needs the ability to do break-bulk and verify individual serial numbers against outer pack label. This needs to tie into the use of AIT devices.
Recommended
Mission Critical Mission Critical - too many items are packaged with S/N and UII - costly to break the box open to record all of the packed items within the crate. Scanning external barcode will allow for all items to be receipted without additional packaging costs.
Benefits Reduces time Reduces packaging costs Improves Accountability of inventory within the crates.
Users All users within ASA(ALT) will benefit from this action. |
|
|
01387 |
3A - Virtual W/H |
Enterprise |
Army: ASA(ALT) |
Done |
Description 3A = Requires the ability to bulk ship materiel and break apart on ground and generate issue doc after its been shipped (tie into unit issue MRO, but eventually MRO and leave books)
Recommended Potentially use a virtual warehouse
Mission Critical No
Benefits Improves Accuracy Increases Accountability Decreases time
Users ALL
Completed – Release 2020.1 – 6 March 2020 |
|