Description
For GSA vehicles, monthly mileage is used to determine fuel cost. Meter readings are either captured at the pump from manual input from driver or agencies can transmit via a File Transfer Protocol (FTP). Desire is to use end meter readings from DPAS Dispatch as a more accurate utilization for transmitting to GSA for cost determination.
Recommended
Similar to AIRRS flight utilization reporting, transmit captured meter readings from DPAS Utilization, at a minimum, weekly to GSA via FTP. Make DPAS the authoritative source for GSA leased utilization reporting.
Mission Critical
This is mission critical and mandated for GSA vehicles IAW Drive-Thru’s FTP Monthly Mileage Upload Tool User Manual
(http://www.gsa.gov/portal/getMediaData?mediaId=208083)
Benefits
Improves accuracy in utilization reporting, eliminates the manual monthly reporting and uses DPAS as the authoritative source
Users
This is a Fleet Manager (M&U Officer) requirement to report asset level utilization and the Dispatch Officer/Specialist will capture at close of each Dispatch.
Combined with SCR #00990 and SCR #01142
Completed – Release 7.0 – 20 April 2019

Please be advised that Navy Property Accountability module users will be unable to access ELMS during the period beginning 3pm EST on Tuesday September 29th, until 8am EST on Friday October 2nd due to the annual EOFY lockout period. If you have questions, please direct them to the Navy PP&E Management Support Office via their centralized email inbox, which is
Please be advised that ELMS will be unavailable beginning Friday, October 2nd at 9:00 pm EST for server maintenance. Estimated downtime is stated to last up to 60 minutes in length - please plan accordingly.