System Change Requests Header

Unlike submitted Support help tickets, System Change Requests (SCR's) can only be submitted through your organization's appointed and authorized ELMS CCB member representatives, or otherwise if no CCB representatives have yet been appointed, your Primary Information Owner appointee. If you are unsure of who your organization's appointed ELMS CCB member representatives or Primary IO are, you may email the ELMS Support team to request that information: This email address is being protected from spambots. You need JavaScript enabled to view it..

To learn more about the process, please visit our CCB Responsibilities and Meetings page. Below you will find all SCR's that have been submitted, and what their status is. To download a blank form, you may visit our Reference Library and download the SCR Form.

Enter your SCR Number in the filter below, or click the column title header to sort by that column. You may also download an Excel file of the record data by selecting the button below.

Filter 
SCR Number Title DPAS Module Reporting
Organization
State Description
02243 Property Allocation Research Warehouse DLA - LESO New
Change Request: 
Process Improvement

Description: 
The LESO requires a systematic research process to prevent the over-allocation of excess property to Law Enforcement Agencies (LEAs) in the DoW 1033 program. A lack of visibility into past and current property transfers creates a risk of improper allocation and inefficient resource management
 
Recommended: 
See Attachment (ELMS SCR - Allocation_Report.docx)
 
Mission Critical: 
LESO MOU; EO14288; DODIG-2020-129 (Project No. D2020-D000AT-0021.000);  

Benefits: 
Enhanced Accountability and Compliance; Improved Resource Management and Efficiency; Strengthened Program Integrity and Public Trust; Data-Driven Decision Making; Mitigation of Risk
 
Frequency: 
Daily
 
Users:
This is a high-volume function utilized multiple times per day. The exact frequency is dependent on the daily number of incoming requests and transfers that need to be processed. Number of users will depend on the number of users at the Site and LP levels
02242 AFTO 244 Alignment MU USAF - A4/HAF FH-AFHAF New
Change Request: 
Policy / Regulatory
 
Description: 
The current automated version of the AFTO Form 244 does not fully comply with Air Force policy requiring accurate documentation of maintenance and inspections on aviation support equipment (ASE) as outlined in TO 00-20-1 and AvSE Interim Guidance. Current guidance requires the phase out ELMS auto-generated 244 and use of DAF AFTO 244 upon completion of inspection or requiring new DAF AFTO 244 whichever comes first.  Specifically, it does not allow for proper inclusion of status symbols or the documentation of partially mission capable (PMC) conditions, which are essential for tracking ASE readiness and serviceability.
 
Recommended: 
A SCR is underway to incorporate PMC status and additional capabilities into the automated AFTO 244.  It would be beneficial to align the automated output with the AFTO 244 with the requirements set forth in TO 00-20-1, would improve accuracy and reduce the risk of documentation errors.  Additionally, work plan description and work order data fields should be aligned to populate the AFTO 244 with the Service Requested as documented in the work order.  This will provide a more detailed description of the discrepancy listed on the AFTO 244. See attached examples

Mission Critical: 
The requirement to utilize an AFTO 244 form is referenced in AvSE MIS Interim Guidance and is referenced in TO's 00-20-1, 00-20-2 and DAFI 21-101

Benefits: 
Standardization of the form would improve accuracy and reduce the risk of documentation errors for field personnel utilizing the automated and official DAF AFTO 244 form, AvSE MIS Interim Guidance requires use of DAF AFTO 244 and phase out of auto-generated ELMS 244.
 
Frequency: 
Hourly
 
Users: 
8.5K personnel utilizing maintenance information system, leadership w/in Quality Assurance positions inspecting proper/compliant usage, and form is reviewed prior to utilizing Form 244's respective equipment.
02241 Add Document Unit Price to Inventory Transaction Inquiry Materiel Management USCG New
Change Request: 
Process Improvement
 
Description: 
The Uniform Distribution Center (UDC) users rely on the Inventory Transaction Inquiry on the ICP side to support end of month inventory reporting. Currently, this inquiry only displays the Unit Price, which does not always reflect the actual document unit price used at the time of the transaction. As a result, UDC personnel must navigate to Warehouse module ro locate the document unit price and do manual calculations, creating inefficiencies and increasing the risk of reporting discrepencies.
 
For example, in the UDC ICP (USCG) - Stock Nbr - BCPL. The Unit Price is $9.94,  but the document unit price is $8.57.

Recommended: 
Add Document Unit Price as a selectable grid option within the Inventory Transaction Inquiry.

Mission Critical: 
N/A

Benefits: 
Implementing this solution would eliminate the need to cross reference the warehouse module and provide a single authoritative source for reporting.
 
Frequency: 
Weekly
 
Users: 
USCG users
02240 Manual Close-Out In-Transits Capability Registry (SA/LW) SOCOM New
Change Request: 
New System Process
 
Description: 
The registry currently does not have the capability to manually close out  In-Transit Registry Assets. This is required as there are many in-transits shipments that are not being auto-closed. Presently, SOCOM Registry does not reflect an accurate status of Small Arms/Light Weapons serial number data at the USSOCOM Registry.

Recommended: 
System should allow capability to manually update in-transits for shipments that are already received by the gaining unit and verified by the designated SOCOM user. SOCOM requests a Manual Close-out capability in Registry similar to the manual update function at ICP with the ability to attach supporting transaction documents.

Mission Critical: 
To follow DLMS 4000-25, Volume 2, Chapter 30
C30.5.1.2.3.  DoD Components must establish active, inactive and historical records of all SA/LW to include those previously under custody/ ownership.   All SA/LW records must be retained in accordance with the National Archives and Records Administration (NARA).  The history of weapons must be readily available to respond to FOIA requests, law enforcement inquiries, or any other official request from an authorized organization

Benefits: 
-This change will enable ability to reconcile assets status at USSOCOM Registry
-This change will eliminate help desk ticket requirements to make changes to Registry
-USSOCOM Registry will serve as one stop module for weapons FOIA inquiries request
 
Frequency: 
Daily
 
Users: 
Recommend change to Registry Agency Manager Level Role to enable manual closeout process for In Transit Weapons transactions that USSOCOM has confirmed receipt of by either gaining customer, or the gaining Warehouse activity.
02239 ADVANA Data Feed Update PA,MU,Warehouse,Materiel Management,FSM,Registry (SA/LW) SOCOM New
Change Request: 
Process Improvement
 
Description: 
Expansion of data fields from ELMS available to ADVANA, the current USSOCOM data feed is limited to the On Hand/Asset Visibility Data
 
Recommended: 
Provide data elements as indicated on attached Excel Document. This will expand the ELMS data available to ADVANA for USSOCOM Data Dashboards and decision making

Mission Critical: 
Supports USSOCOM ability  to meet its Title X, U.S.C. Sec. 164 & 167 responsibilities. Supports USSOCOM compliance of DoDD 8190.01E, DLM 4000.25, DoDI 4140.01, DoDI 5000.64, DoDM 4140.01 V8, DoDM 4140.01 V11, DoDI 4161.02, FMR 7000.14, FAR & DFARS, and FIAR initiatives.
 
Benefits: 
Enables USSOCOM to meet its Title X, U.S.C. Sec. 164 & 167 responsibilities.
 
Frequency: 
Daily
 
Users: 
All ADVANA users of the USSOCOM SPARTA enclave
02238 Add new data fields to catalog and DLMS 832N transaction. Materiel Management USAF New
Change Request: Policy/ Regulatory
 
Description: 
DLMS ADC 1510 provides new data fields for the DLMS 832N transaction - added are the reportable method for OM&S and the weapon system variant. Need ELMS to add the new data fields to the catalog and to the 832N and include in DLMS transaction processing (including 824R reject transaction).
 
Recommended: 
Make necessary changes in the ICP module process and correctly handle the reportable method of OM&S and the weapon system variant.  Users will see new data in the DLMS transaction viewer and ELMS will include these new data elements in the DLMS 824R Reject notification process.

Mission Critical: 
ADC 1510 signed 2/5/2026
 
Benefits: 
The added data elements within the 832N will allow the services to determine their reportable methodology for OM&S and any subsequent 824R Reject notifications to AF CICPs.
 
Frequency: 
Weekly
 
Users:
AF GFM-A users and other services reporting OM&S
02237 SKO Catalog Warehouse ARMY ASA(ALT) New
Change Request: Process Improvement
 
 
Description: 
In the current Warehouse module, there is no functionality to add stock numbers that were not originally designated as Kits to the SKO Catalog. The existing rule set dictates that if any verified transactions—regardless of their state (open or closed)—exist for a stock number where it was treated as a normal end item, that stock number cannot later be designated as an SKO Header in the SKO Catalog.
This restriction applies to all transaction types, including receiving transactions. For example, if assets were ever received into the Logistics Point (LP) under a stock number as normal end items, the act of receiving those assets permanently prevents that stock number from being converted into an SKO Header in the SKO Catalog, even if the inventory associated with that stock number is subsequently removed. This limitation ensures consistency in the system but may require additional planning when managing stock numbers intended for SKO use.
 
 
Recommended: 
Enable the capability to utilize previously used stock numbers, even those with historical records as assets categorized as end items, as SKO Headers within the SKO Catalog. This functionality would provide greater flexibility in managing stock numbers, allowing them to be repurposed for kitting processes while maintaining consistency and traceability in the system.

 
Mission Critical: 
Army Regulation (AR) 700-18: Covers logistics and supply chain management, including kitting processes.
DoD Instruction (DoDI) 5000.88: Provides guidance on engineering and configuration management.
MIL-STD-973: Establishes standards for configuration management across DoD programs.
 
 
Benefits: 
Reducing this limitation enhances system flexibility while maintaining consistency, allowing users to fully meet the intent of various kitting functionalities. This improvement supports diverse configurations within the SKO process, enabling more efficient management and adaptation to evolving operational requirements.

 
Frequency: Daily
 
 
Users: All
02236 Improve Issue/Return Activity Inquiry Warehouse USAFA New
Change Request: Process Improvement
 
Description: 
When navigating to Inquiries and then Issue/Return Activity, issue, return, and charge transactions are not visible by default and require expanding the arrow for each transaction to view the details.
 
Recommended: 
 Configure the Issue/Return Activity screen to display issue, return, and charge transactions by default, eliminating the need to expand the arrow for each transaction. The current Issue with Return Details view is close to the desired outcome; however, the goal is to display all transactions line by line without requiring users to expand each entry to view returns, issues, or charges. All existing columns—such as cost, issuer, item, and related details—are already correct and should remain unchanged.
 
Mission Critical: 
Configure the system to display issue, return, and charge transactions by default, eliminating the need to expand the arrow. This reduces extra clicks, improves visibility of all transaction types, minimizes the risk of missed information, and increases efficiency for users reviewing transactions.
 
Benefits: 
Configuring the system to display issue, return, and charge transactions by default improves efficiency by allowing users to view all relevant information immediately without extra clicks. This increased visibility reduces the risk of missing critical transaction details, supports more accurate reviews, and minimizes errors. By streamlining navigation and eliminating unnecessary steps, the process becomes faster, more intuitive, and enhances overall user productivity and experience.
 
Frequency: Daily
 
Users: This system is used daily to review and manage issue, return, and charge transactions as part of regular operational workflows. Users rely on it to quickly access complete transaction details, verify accuracy, resolve discrepancies, and support timely decision-making. Because the system is a routine part of daily work, clear visibility of all transaction types is essential to ensure efficient reviews, reduce delays, and maintain accuracy across ongoing operations.
02235 Add Materiel Mgmt. Externally Managed Assets to Advana Data Feed Materiel Management DLA New
Change Request: Process Improvement
 
Description: 
ELMS sends Property Accountability and Warehouse materiel / assets to Advana as part of its Asset Feed each Saturday and the first of the month.  It does not send materiel / assets that are managed by Contractor Operated Inventory Control Points (C-ICPs) or materiel managed by External Remote Storage Activities e.g. DLA, Army, Navy, etc. that are being reported to the ELMS Materiel Mgmt. application.  Including this materiel in the data feed will provide full visibility to the owners.
 
Recommended: 
1. Add materiel / assets to the ELMS Advana Asset Feed that are not managed within ELMS, but are reported to ELMS Materiel Mgmt.  Client Cd 'C', 'E' and 'R' apply.
2. Make the same extract available to other entities that utilize the same feed e.g. Vantage, LDS/MDR, SOLMAN, NSWC, etc. should they wish to receive this data as part of the ELMS feed.  
 
Mission Critical: 
Provides visibility to program materiel/assets that are not managed using ELMS  (Property Accountability / Warehouse) but are part of the entity that is using ELMS for Program Management (ASA(ALT), JSF, AF GFM-A, USSOCOM, USMC, etc.)
 
Benefits: 
Providing this data as part of the ELMS datafeed will provide a full asset visibility picture for the program managers when they are using data warehouses to create specific views.
 
 
Frequency: Weekly
 
 
Users: Agencies that will use this informations include: ASA(ALT), JSF, AF GFM-A, USSOCOM, USMC, etc.
02234 Navy Capital Threshold Changes PA,Materiel Management Leidos New
Change Request: Policy / Regulatory
 
Description: 
The Department of Navy is updating its General Fund capital thresholds to $15 Million Dollars for equipment and Real Property and Real Property Improvements.
 
Recommended: 
Update ELMS Capital Threshold table for Navy General Fund to $15 Million effective Oct 1, 2025 (FY26).
 
Mission Critical: 
Provides updated capital thresholds for the Department of Navy
 
Benefits: 
Policy / regulatory compliance.
 
Frequency: Hourly
 
Users: All Navy users with capital assets.
02233 Improvements to Reconciliation Materiel Management USAF New
Change Request: Process Improvement
 
Description: 
DAF CICPs send 846P and 846R transactions into ELMS each day and month for a two-part reconciliation.  First part consists of 846P transactions providing an end of day transaction count.  The second part consists of 846R transactions providing an end of day inventory report.  If either part fails reconciliation, ELMS flags with a red indicator.  The reconciliation depends on users to trigger follow-up actions to correct situations causing the failure.  DAF recommends automating those follow-up actions to enable a system-to-system reconciliation that removes user intervention.  This will enable more accurate and complete inventory balances and their supporting transactions in ELMS.  This will improve financial reporting accuracy for the DAF.
 
Recommended: 
Recommend that ELMS ICP module adds automated follow-up actions for reconciliation failures.  For the end of day transaction counts: if the reconciliation fails, ELMS should send a transaction history request to the CICP’s system for the failed transaction set.  The CICP’s system will return all the transactions for the failed transaction set for that day (marked with W1 in the appropriate action code field).  ELMS will identify the missing transaction(s) and process those as if they were received that day.  This will clear the reconciliation failure and potentially reduce the number of end of day/end of month inventory balance mismatches.  For the end of day/end of month inventory balances: if the reconciliation fails, ELMS will send inventory request transaction(s) to the CICP’S system for the mismatched stock numbers.  The CICP’s system will return the end of day/end of month inventory position by stock number.  ELMS will use those inventory balances to create 947I Inventory Adjustment transactions to update the balances to match the CICP’s system balance.  
 
Benefits: 
This will enable more accurate and complete inventory balances and their supporting transactions in ELMS.  This will improve financial reporting accuracy for the 100+ DAF CICPs.
 
Frequency: Daily
 
Users: This requirement improves the end of day/end of month reconciliation for the 100+ DAF CICPs
02232 Enhance Issue and Return Functionality Warehouse AF: USAFA New
Change Request: Process Improvement
 
Description: 
 
• Issue and Return processes are separated into different tabs.
• To verify a cadet’s account history prior to issuing an item, staff must navigate to the Return screen, then switch back to the Issue screen.
• Item cost and charge information is not visible during the issue/return process and must be accessed through other systems or screens.
• These steps add approximately one minute per cadet and significantly slow down operations during high-volume periods.
 
Recommended: 
The requested functionality includes creating a single unified Issue and Return screen that combines both processes into one interface, allowing staff to remain in Issue or Return mode—or perform issuing, returning, and charging simultaneously—after scanning a cadet’s CAC card, eliminating the need to switch tabs. Upon scanning, the system should immediately display the cadet’s full issue and return history on the same screen, including currently issued items and prior transactions, enabling staff to prevent duplicate issues such as issuing a second ruck when one is already on record. The interface should also provide item cost and potential charge transparency by displaying pricing information as each item is scanned, recording those costs in the cadet’s history for audit and accountability purposes, and reducing confusion or disputes over replacement or loss charges. Overall operational efficiency should be improved by enabling account verification, pricing review, and item issuing or returning from a single screen, reducing processing time per cadet. Additionally, the system should reintroduce an account lock or alert feature similar to the legacy system, with prominent red warnings for locked accounts (ex, “Lost saber – replacement already issued”) and the ability for staff to add notes to cadet accounts, helping prevent duplicate issues, conflicts, and frustration for both staff and cadets.
 
Mission Critical: 
The process of improvement focuses on streamlining and enhancing the Issue and Return workflow by consolidating functionality into a single, unified screen. By combining issuing, returning, and charging actions within one interface, staff can complete all related tasks without switching tabs, reducing complexity and errors. Immediate visibility of a cadet’s full issue and return history upon CAC scan improves decision-making and prevents duplicate item issuance. Displaying item costs and potential charges at the time of scanning increases transparency, strengthens accountability, and minimizes disputes related to lost or replacement items. Operational efficiency is further improved by enabling account verification, pricing review, and transactions from a single screen, reducing processing time per cadet and increasing throughput. Reintroducing an account lock and alert mechanism with prominent warnings and staff notes enhances control, prevents repeat issues, and supports consistent enforcement of policies, resulting in a more efficient, accurate, and user-friendly system overall.
 
Benefits: 
Introducing this functionality provides significant benefits by improving accuracy, transparency, and efficiency across the Issue and Return process. A single unified screen reduces staff workload and training complexity while minimizing errors caused by switching between tabs or systems. Immediate access to a cadet’s complete issue and return history helps prevent duplicate issuances and ensures better accountability for equipment. Real-time visibility of item costs and potential charges increases transparency for both staff and cadets, reducing confusion, disputes, and time spent resolving billing issues. Enhanced operational efficiency shortens processing time per cadet, improves throughput during peak periods, and allows staff to focus on customer service rather than system navigation. The reintroduction of account locks, alerts, and notes strengthens oversight, prevents repeat losses or improper reissues, and promotes consistent policy enforcement, ultimately resulting in a more reliable, user-friendly, and trusted system.
 
Frequency: Hourly
 
Users: This process is performed multiple times throughout the day, often repeatedly during normal operations, especially during peak issue and return periods.
02231 Work Order Serviced by External (Warranties) – Warehouse Issue DD1149 MU,Warehouse Army ASA(ALT) New
Change Request: Process Improvement
 
Description: 
 
When an asset comes in for routine or non-routine maintenance and the asset is under warranty current capability within work order provides the ability to mark the work order as being “Serviced By” external organizations. However, the current capability is limited to only marking that the asset is being serviced by an external organization and does not accommodate the ability to show the asset as being shipped to the external organization and print the DD1149 for shipment. It also leaves the associated WM Inventory record in WM Inventory even though the ICN is no longer on hand but is instead shipped to the servicer.
 
Recommended: 
See Attached supporting file
 
Mission Critical: 
This initiative enables the PEO community to achieve compliance with policy and audit requirements by ensuring transparency and effective life-cycle management of inventory.
 
Benefits: 
 
It provides the necessary framework for PEOs to maintain accountability and oversight of assets within their purview, supporting operational readiness and aligning with enterprise-level objectives.
 
 
Frequency: Daily
 
 
Users: ~450 users
02230 Modify Warehouse SKO components in Work Order – Modification Work Order MU,Warehouse Army ASA(ALT) New
Change Request: Process Improvement
 
Description: 
 
ASA(ALT) current applications provide functionality specifically for Inventory/Asset Modifications for both Kits as well as for end items (un-kitted). These Modification work orders provides for the ability to make modifications to numerous end items which may or may not result in a re-identification of the stock number associated to the end item. DPAS does provide re-identification functionality within Warehouse, but this functionality is manual and can only take place on a one-at-a-time basis. There is also no functionality within DPAS that manages the progress of these MWO projects.
 
Recommended: 
See Attached supporting file
 
Mission Critical: 
This initiative enables the PEO community to achieve compliance with policy and audit requirements by ensuring transparency and effective life-cycle management of inventory.
 
Benefits: 
 
It provides the necessary framework for PEOs to maintain accountability and oversight of assets within their purview, supporting operational readiness and aligning with enterprise-level objectives.
 
 
Frequency: Daily
 
 
Users: ~450 users
02229 Master Asset Records - Create MU,Warehouse Army ASA(ALT) New
Change Request: Process Improvement
 
Description: 
Currently there is no representation of warehouse inventory within associated M&U Maintenance Activities. These assets are needed in M&U in order to accommodate the creation of ad hoc work orders as well as to schedule preventative maintenance and work plans.
 
Recommended: 
Proposed Solution (M&U and Warehouse):  Provide a method in Warehouse to specify when a MAM record should be created in M&U for existing ICN’s and during Receipt. M&U should use the ICN as the Asset ID. M&U needs to also add the standard Condition Codes to MAM and use the Condition Code from warehouse. In the case when the MAM record represents a Kit in Warehouse, M&U will need to include the ability to display the component inventory of the kit (component inventory would not be a MAM record). Warehouse should continue to trigger updates to M&U as ICN information changes- Warehouse should continue to trigger updates to M&U as ICN information changes: 1Stock Number. 2 Condition Code. 3. Any other shared parameters.  Proposed Solution (Warehouse Only): Use the Warehouse Inspection Action process as a means to schedule preventative maintenance.  Modify the warehouse Inspection process to auto generate a Quality Control request. Add functionality to the Inspection Action process to accommodate the addition of work plan steps   Utilize the Warehouse Inspection Assessment functionality within QC as a means for the users to order parts when required
 
Mission Critical: 
This initiative enables the PEO community to achieve compliance with policy and audit requirements by ensuring transparency and effective life-cycle management of inventory
 
Benefits: 
It provides the necessary framework for PEOs to maintain accountability and oversight of assets within their purview, supporting operational readiness and aligning with enterprise-level objectives.
 
 
Frequency: Daily
 
 
Users: ~450 users
02228 Physical Inventory Owner Warehouse Army ASA(ALT) New
Change Request: Process Improvement
 
Description: 
Currently when generating a physical inventory in the ELMS Warehouse module you cannot select the following filters when using all inventory mode’s location, Condition Codes, Owning DoDAAC, Project Code, or Purpose Code. If a single warehouse has locations with multiple Condition Codes, Owning DoDAAC, Project Code, or Purpose Code the user can’t generate the physical inventory for each property owner. This is a big issue for property accountability. Each property owner should be able to sign for their property and only their property.
 
Recommended: 
Add the following data elements to the generation of a physical inventory when using the inventory mode location.
 
Condition Codes, Owning DoDAAC, Project Code, or Purpose Code.
 
Mission Critical: 
Air Force Leadership has directed that all data analytics be performed within Advana/BLADE. This request is in line with the vision detailed in the attached decision memorandum.
 
Benefits: 
All each property owner should be able to sign for their property and only their property. These data elements will allow the users to generate the physical inventories to account for specific asset and not include assets that are not needed for the inventory being generated.  
 
 
Frequency: Weekly
 
 
Users: All
02227 Add Maint Group ID Field to Catalog Base PA AF Removed
Change Request: Process Improvement

Description: 
Requesting the Maintenance Group Identifier (MGID) data field to be added to dbo_catalog_base file for both vehicles and equipment.   MGID is a data field captured in the ELMS catalog but is currently not available in the Advana/BLADE data feed. MGID groups stock numbers based on their maintenance requirements and is used to segregate asset records when analyzing maintenance data and building metrics.
 
Recommended: 
Modify the data feed to incorporate the newly identified data element.
 
Mission Critical: 
Air Force Leadership has directed that all data analytics be performed within Advana/BLADE. This request is in line with the vision detailed in the attached decision memorandum.
 
Benefits: 
This data field would be beneficial to all user groups using ELMS data.
 
Frequency: Hourly
 
 
Users: All Advana/BLADE users of ELMS Data
 
 
Cancelled 1/28/2026 - per email submitted by Jose De Los Reyes
02226 BLADE Requests ELMS Data PA AF New
Change Request: Process Improvement

Description: 
The Advana/BLADE data feed currently lacks all ELMS data.  BLADE has a sub-set of the data available in the ELMS system.
 
The required fields are listed in the attached Excel file.  See tab 2 of attached Catalog Data (WPHRI08) LIMS-EV spreadsheet.  Rows that are not highlighted are not being sent to BLADE today.
 
Recommended: 
Modify the data feed to incorporate the newly identified data elements not highlighted in attached spreadsheet.
 
Mission Critical: 
Air Force Leadership has directed that all data analytics be performed within Advana/BLADE. This request is in line with the vision detailed in the attached decision memorandum.
Sending the remaining ELMS data to BLADE will eliminate re-work to add individual data elements requested by users.
 
Benefits: 
This data field would be beneficial to all user groups using ELMS data.
 
Frequency: Hourly
 
Users: All Advana/BLADE users of ELMS Data
02225 General Database Infrastructural Changes - CY 2026 Leidos New
Change Request: Process Improvement

Description: 
In many application releases, the Leidos team needs to implement various database infrastructural changes and improvements.  These changes include, but are not limited to, index adjustments, configuration changes, and the implementation of database utility objects.  These changes and capabilities can not be invoked directly through the application but are nonetheless necessary for the availability, correctness, and performance of the DPAS system.  I am requesting an SCR for calendar year 2026 to encompass this category of database changes.
 
 
Recommended: 
Implementation of any database infrastructural changes and improvements deemed necessary by the Leidos Team.
 
 
Benefits: 
These changes and capabilities can not be invoked directly through the application but are nonetheless necessary for the availability, integrity, and performance of the DPAS system.
 
 
Frequency: Daily
 
 
Users: N/A - Infrastructural enhancements that wouldn't directly affect the users.
02224 Expansion of ELMS and Jupiter data sharing agreement Warehouse Navy New
Change Request: Process Improvement

Description: 
OPNAV N834 and its expeditionary enterprise, comprising of TYCOM (NECC, CNSF, BUMED, WARCOM) and supporting SYSCOMs (NAVAIR, NAVFAC, NAVWAR, MARCOR, and NAVSEA) stakeholders, cannot easily access data that supports collaboration, planning and risk-based assessments, and the PPBE (Planning, Programing, Budgeting, and Execution) process.  The disparate enterprise data sources have led to time intensive manual data collection efforts, inconsistencies in products being developed for decision making, and have caused unnecessary spending of field assets. This hinders the Navy’s ability to ensure that naval forces are prepared for expeditionary operations, which involve deploying and operating in various environments away from established bases. OPNAV N834 is seeking an expansion of the ELMS/Jupiter Data Sharing Agreement to enhance the current expeditionary enterprise's data capabilities.
 
Recommended: 
OPNAV N834 seeks an ELMS/Jupiter Data Sharing Agreement expansion. Jupiter is currently receiving the ELMS Asset table, reflecting a subset of the ICN Report and the Over / Under Report. OPNAV N834 seeks a full ICN report to include the “Is a Kit” field that provides the expeditionary enterprise the ability to track inventory at the assembly level. Providing logic or code used to produce the field 'Is A Kit' would help drive comparisons capabilities in the current subset of data available within Jupiter. OPNAV N834 additional seeks a full Over / Under to include the "On Hand Qty", "Total Price", "Size Category", "Kitted Qty", "Unkitted Qty", "Due In Qty", "Issued Qty", "Total Qty", "Min Stock Qty", "Max Stock Qty", and "Shortage/Overage Qty" fields to support the tracking of personnel gear on hand to understand each central issuing facility's health in comparison to requirements, thus enhancing the expeditionary community's ability to quantify supply readiness and remedy identified shortfalls.
 
 
Mission Critical: 
MEMORANDUM FOR SENIOR PENTAGON LEADERSHIP COMMANDERS OF THE COMBATANT COMMANDS DEFENSE AGENCY AND DOD FIELD ACTIVITY DIRECTORS.
SUBJECT: Creating Data Advantage
 
 
Benefits: 
By leveraging the Department of the Navy’s Jupiter enterprise data environment, OPNAV N834 and its expeditionary enterprise can expand technical capabilities by ensuring access to a centralized data environment; where users can retrieve readiness dashboards comparisons of EXMIS requirements data and ELMS inventory data. The N834 dashboards and analytic products will improve compliance and risk management, enhance equipment and supply lifecycle projections and reduce cost, grow analytic capability, and support the expeditionary enterprise decision makers at all levels on pertinent information.
 
 
Frequency: Daily
 
 
Users:
There are approximately 250 users in the expeditionary enterprise that are working on comparing equipment requirements to inventory. In order to provide status updates to the executive director, each SYSCOM is manually comparing requirements to inventory data resulting in a lot of man-hours to product executive level view. Overall, this will enhance Readiness across the expeditionary enterprise and allow prioritization of filling equipment gaps.